Estimated Start August 1, 2017

 

1.    Road & Dirt Work 1st 1.5 Mi X 24’ State HWY Grade w/6” base, Entry + 2 ck point gates = 1.330M$, 50% to Start Bal on certification, 2nd 1.8 Mi X 24’ State HWY Grade w/4” Base 1.508M$. Tot. 2.838 M$. Est. 60-day timeline.

2.    512 sec cam install in tandem w/roads. Place along 6 mi of power poles, some new poles installed around construction pad & along perimeter of property

3.    Dirt Work & Site Prep – (DWSP) 7-10 days

4.    Livestock HSG 4 X 12.5k sq ft - 45 days (LSH) 45 days

5.    1 18 X 36 GRN HSE Scale w/ 2 Growth Master units, to be fabricated.

6.    DWSP

7.    Site Prep 4 x 12.5 sf. Wagyu Livestock Housing 45 days

8.    DWSP

9.    Full scale 1 x 25k sf Beyond Organic’s facility 90 days

10.  DWSP

11.  Site Prep 6k sf Machine & Fab Shop

12.  Site Prep for 24 .5 Mw Gen Set pads12 pads (+ 2 mobiles) Appx 10’ X 20’. 7.2 Mw total 7-9 Mw capacity sustainable 5+ yrs. @ 7.2 Mw months

13.  Composting site APPX 1.5 Acres 24” deep

14.  DWSP

15.  AD RNG Plant 1.2 Mw Appx 12.5k sf

16.  DWSP

17.  Data Caster Labs Bldg. 101 Incl. - 1st Zero Energy BIO Diesel Plant. 25k sf Ultra-secure data facility. 8-9 months (15k servers)

18.  MOMs Lodge; DWSP 22k sf 3fls 2 up 1 down. DWSP Garden & Play Park

19.  DWSP Equestrian CNTR & MOE Vineyard. 6-9 months

20.  75k sf scaling, production, packaging & labeling

21.  Site Prep MOMs Lodge 12.5k sf Pad w/ 12-acre site

22.  Dirt wk west end lake bed

23.  Site prep for American Landrace hogs (350)

24.  Vineyard Prep 3 stage 33 acres ea. + fermentation & below ground cellar

25.  DWSP

26.  PKG Plant Temp. Ό scale 3k sf. start full scale 12.5k sf 9-12 months Est. start date May, 2018w/quick chill freezer & cold store

27.  DWSP

28.  Landing road Empire Municipal AP Ύ mile

Notes:

All bldgs. Equipped w/rain recovery syst. Appx 500k sf surface area at planned build-out 15-18 months.

 

 

•               25 Bldgs. @ 12.5k sf

•               6 Bldgs. @ 25k sf

•               1 Bldg. @ 75k sf

•               12 Gen-set Pads@10’ X 20’

•               1 Bldg. @ 7.500 sf

•               1 Bldg. @12.5 sf.

•               1 Bldg. @ 22.5 sf.

 

Build-Out

 

15-18 months w/ $37M budgeted, approx. $8.2M per quarter draw down

 

 

·         Empire Builders: Dirt work, site prep. and approx. 5 miles of road paving.

·         E Q Power: 7.2 Mw Waste to Bio-Gas/Diesel and Wastewater treatment plants.

·         Empire Packers: USDA approved multi-species packing plant. 25 beeves per day/cap.

·         Prime+: Aging, curing, smoking, cold storage, freezer, processing and retail packaging facilities.

·         Livestock Housing: 12,500 sq. ft. structures w/slab 83’ X 150’ appx. 250k sf.

·         Beyond Organics: Greenhouse facilities 25,000 sq. ft. structures w/slab 85’ X 300’ appx. 150k sf.

·         Empire Engineering: Fabrication of 1,290 GrowMaster continuous harvest units.

·         Beyond Organics: Capital improvements to reservoir for aquaculture/feedstock operation.

·         Magnum Opus Manor Lodge: Mgmt. HQ, Partner, Guest and Customer conference facilities.

·         R&D facilities: Biologics, genomics, product development, etc.

·         Wildlife mgmt.: Hunting, Fishing and Recreation facilities and equipment.

·         E Q Waterworks: Restoration of 900-acre wetland area for conservation and water mgmt.

·         Empire Engineering: Engineering, Machining, Fabrication, Construction and Maintenance facilities.

·         Data Caster Labs: 1,500 server datacenter scaling to 15,000 (owner/operator partnership).

·         MOE Vineyards: 30-acre± scaling to 100, premium wine grape vineyard.

 

Build-Out Schedule

____________________________________________

Assign Lead man to EA PC

Scope & Concepts

1.    Simultaneity (e.g. 4 12.5k LS Bldgs. then…)

2.    Managed Capacity

3.    Planning & co-ord.